Delivery of dual-fuel diesel system

When our client was going to change their fuel systems to more environmentally friendly dual-fuel system on 12 of their LPG tankers, we were tasked to manage the challenging transports from supplier quay till delivered at shipyard.

A fully integrated project logistics solution was presented and chosen. Suitable heavy lift barges were chartered and heavy marine engineering conducted to prove viability and safety of the transports. As total solution contractor, a Marine Warranty Surveyor was engaged on behalf of the client, fully approving all technical solutions and securing of goods. Transports took place during China’s extreme typhoon season, posing extra challenges to the project. Deliveries were fully completed with little or no issues noted from MWS.